Vincennes Wastewater

Report Sewer Problems
To report problems with your sewer or storm inlets in your area, call (812) 886-5011. Our normal hours of operation are from 8 am-4 pm, however, we do have operators on call 24 hours a day and this line is forwarded to them after hours.
(812) 886-5011
Report a Problem
Sewer Bill Questions
For questions about your sewer bill, call the billing office at (812) 882-7877 about water and sewer fees. Our normal hours of operation are from 8 am-4 pm, however, we do have operators on call 24 hours a day and this line is forwarded to them after hours.
(812) 882-7877
Call for Questions
New Sewer Tap Installation
For a new sanitary sewer tap installation, please call (812) 886-5011.  One of our supervisors will arrange a time to meet with you and do an estimate of costs. For a replacement sewer tap, the fees are $700 and a $50 inspection fee will be charged for all sanitary and storm hookups.
(812) 886-5011
Schedule New Installation
Any Questions about Wastewater Plant contact Josh Moore at jmoore@vinutilities.com.
Any Questions about Wastewater Collection contact Stan Eck at staneck@vinutilities.com.

Vincennes Sewer Rates

City of Vincennes Ordinance No. 12-2016, establishes rates and charges for services to be rendered by the sewage works. The rates structure is as follows:
Within City Limits
Outside City Limits
Within City Limits

Base Charge per Month

Ixon
Metered Rates (per 100 cu. FT)
Ixon
5/8 inch meter
Ixon
3/4 inch meter
Ixon
1 inch meter
Ixon
1 ½ inch meter
Ixon
2 inch meter
Ixon
3 inch meter
Ixon
4 inch meter
Ixon
6 inch meter
$6.23
$5.99
$5.99
$15.34
$34.52
$61.36
$138.07
$245.45
$552.27

Un-Metered Monthly User

Ixon
Any Un-Metered Monthly Residential
$55.86
$299 / month

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse mattis tortor vel massa aliquam.

Ixon
One-on-one coaching session
Ixon
Access to group workshops
Ixon
Community access
Ixon
Basic online course library
Ixon
Networking events
Ixon
Online course
Icon
Lead capture forms
Ixon
Training
$399 / month

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse mattis tortor vel massa aliquam.

Ixon
One-on-one coaching session
Ixon
Access to group workshops
Ixon
Community access
Ixon
Basic online course library
Ixon
Networking events
Ixon
Online course
Ixon
Lead capture forms
Ixon
Training

Wastewater Facility

Class IV Treatment Facility

The City of Vincennes owns and operates a Class IV activated sludge wastewater treatment facility that provides preliminary, primary and secondary treatment for influent wastewater. The wastewater treatment facility treats domestic, commercial and industrial wastewater prior to discharge to the Wabash River in Knox County, Indiana.

Facility Improvements

Since its original installation in 1912, several improvement projects have been completed on the treatment plant. The original facility consisted of only one pump station and bar rack for preliminary screening before discharge to the river.  In 1958, a new pump station and primary treatment facilities were constructed that had a design flow of 4.56 million gallons per day (MGD).

The facilities included comminution, grit removal, primary settling, chlorine disinfection, and anaerobic sludge digestion. The facility was then again updated in 1973 with the addition of secondary biological treatment, including aeration and clarification. Other facility improvements and equipment replacement were conducted in 1995.  Despite these improvements, the wastewater treatment capacity did not increase beyond the original 4.56 MGD.

To address the City’s improvement and expansion needs, as well as regulatory concerns, a plan for the expansion and upgrade of the Vincennes Wastewater Treatment Facility began development in around 2000. The expansion and upgrade, which was completed in 2004, increased treatment capacity to an average daily design flow of 7.5 MGD. That is an increase of approximately 63% over the 4.56 MGD flow design the City had since 1958.  The design peak hourly flow increased from 5.65 MGD to 22 MGD to full treat all wet weather flow at the facility.

Some other improvements that were deemed a necessary part of the upgrade were collection system improvements. The collection system is the actual network of sewer pipes, manholes, lift stations and pump stations that direct the wastewater flow to the treatment facility. These improvements included new sanitary interceptors and existing interceptor improvements to collect wastewater from currently unsewered areas and to convey wastewater to a new lift station. The new, larger lift station at Watson Street pumps wastewater through a force main directly to the plant head-works. A drainage project in the 13th and St. Clair area also was completed which helped to alleviate some of the flooding those residents experienced in wet weather.

The facilities included comminution, grit removal, primary settling, chlorine disinfection, and anaerobic sludge digestion. The facility was then again updated in 1973 with the addition of secondary biological treatment, including aeration and clarification. Other facility improvements and equipment replacement were conducted in 1995.  Despite these improvements, the wastewater treatment capacity did not increase beyond the original 4.56 MGD.

Labratory Crew

There are 18 employees at the Vincennes Wastewater Treatment Facility.  The facility has a laboratory that conducts daily testing of influent and effluent water quality through various processes. Three full-time operators maintain the processes in the plant and sludge production. The collection system crews are the employees that you see in the streets every day. They are responsible for sanitary maintenance, tap replacements and installations, storm inlet cleaning and maintenance, storm line cleaning and maintenance, lift station maintenance and any other wastewater conveyance issues that may arise.